Factory Price Li-ion 3350mAh-7.4V Panic Light Ballast Emergency Drivers for Triproof Light Down Light Ceiling Light Highbay Light Panel Light Wallpack
1.Meet most of safety standards for lighting
2.Standard CSA C22.2 NO.141 UL924
3.External lithium battery
4.Battery protections: over charge protection over discharge protection short circuit protection
6.Indicator shows a variety working modes
7.The batteries Meet 500 cycles of standard CH and standard DCH
9.RoHS compliant
Model NO. |
MF-KM-xxW-10W |
Input Voltage |
100~347Vac,50/60Hz |
AC Input Current
|
100mA max
|
AC Input Power Rating
|
7.0W max.
|
Battery Charging Current
|
250mA
|
Charging Time
|
≥24Hours
|
Output Current and Voltage
|
20-55V/60-260VDC
|
Emergency Time
|
≥1.5H
|
Battery
|
Li-ion 3350mAh-7.4V
|
Output Power
|
10W
|
Warranty |
5 Years |
Temperature Rating Ambient
|
Li-ion 0°C to 50°C (32°F to 104°F)
|
Operation:
AC Operation:
AC power is present,The LED load from the LED driver is normal power supply, AC LED driver output current can not exceed150W or 4A,the emergency driver is charging in a standby mode,The green LED
light on to indicate that it is charging.
Emergency operation
When the AC power goes out,The emergency driver detects the AC power outage and automatically
switch to the working emergency mode.The green LED off.When the AC power is restored,the
emergency driver backs to AC power working and starts re-charging, the green LED light on.
Indicator Light
1.AC Operation, indicator light will keep on
2.Emergency Operation, indicator light flash slowly (light on for 1 seconds, light off for 1 seconds)
3.In a failure, indicator light flash quickly (light on for 0.02 seconds, light off for 0.02 seconds)
Test Switch
1.In AC Operation, press test switch once, emergency for 20 seconds
2.In AC Operation, press test switch twice in asuccession within two seconds, emergency until battery is full discharged
3.In the emergency operation, press test switch will turn off emergency status, and led lamp & indicator
light of EM driver will go out at the same time
1.Listed North America UL cert.
2.Comply UL924 ordinances, CSA C22.2 No.141 in-site assembly
3.Constant power output
4.High voltage output
5.Comply emergency saving CEC ordinance
6.Charging and dis-charging protection function and over heat temp. protection
7.Mock-up electricity pause emergency testing function
8.Can be power off under emergency status
9.Indication light: city grid electricity
10.Seasonal self detect function
11.Protection functions: over voltage, short circuit, over load and open circuit
12.Metallic housing, comply EMC, FCC and C-tick ordinances
13.IP grade: IP2
Commercial Office Buildings
Provides code-compliant emergency lighting for hallways, stairwells and exit routes during power outages. Maintains illumination for safe evacuation.
Healthcare Facilities
Critical backup lighting for hospitals and clinics where uninterrupted lighting is essential for patient care and emergency procedures.
Educational Institutions
Ensures safe evacuation paths in schools and universities during emergencies with 90 minutes of reliable backup power.
Industrial Plants & Warehouses
Rugged design withstands harsh environments while providing emergency lighting for hazardous areas and manufacturing facilities.
Retail Stores & Shopping Malls
Maintains emergency aisle lighting and exit signage to guide customers to safety during power failures.
Public Transportation Hubs
Essential for airports, subway stations and bus terminals where continuous lighting is critical for passenger safety and evacuation procedures.
Hospitality Industry (Hotels & Resorts)
Ensures guest safety by maintaining emergency lighting in corridors, lobbies and fire exits during power disruptions. The self-testing feature provides automated compliance with safety regulations.
Residential High-Rise Buildings
Critical for apartment complexes to illuminate stairwells and common areas during blackouts. The 90-minute runtime exceeds most building code requirements for residential emergency lighting.
When using electrical equipment, you should always follow basic safety precautions, read and follow all safety instructions, including the following:
1.Risk of fire or electric shock.Luminaire wiring and electrical parts may be damaged when drilling for installation of LED Emergency Backup Check for enclosed wiring and components.
2.Risk of fire or electric shock.This LED Emergency Backup installation requires knowledge of luminaire electrical systems.If not qualified do not attempt installation. , Contact a qualified electrician.
3.Before installing make certain the AC power to the fixture is off.
4.The electrical rating of this product is 100-277Vac/347Vac.Installer must confirm that there is 100-277Vac/347Vac
to the fixture before installation.
5.To prevent electrical shock only mate unit connector after installation is complete and before the AC power to the fixture is back on.
6.Do not use in outdoor.
7.This LED Emergency Backup unit requires an un switched AC power source of 100-347Vac 50/60Hz The AC driver must be on the same branch circuit as the LED Emergency Backup unit
8.Do not let power supply cords touch hot surfaces.
9.Do not mount near gas or electric heaters.
10.Do not connect battery pack connector until all other wiring is complete and AC power is on
11.The emergency LED driver is for use with grounded,ULlisted LED luminaires,shall be enclosed by the LED luminaire and bonded to the grounding of LED luminaire
12.Verify that all replacement lamp types marked on the installed luminaire are also identified as suitable for use with this emergency battery pack.
13.Equipment should be mounted in locations and at heights where it is not be subjected to tampering by unauthorized personnel.
14.The use of accessory equipment is not recommended by the manufacturer and may cause an unsafe condition.
Q1: Are you a factory or a trading company? Where is your company located?
A1: We are 100% a factory, not a trading company. Our company is located in Dongguan, between Shenzhen and Hongkong Guangzhou, China.
Q2. How about the lead time of LED Linear High Bay Light ?
A2: 3-7 days for sample order, 15-25 days for mass production order base on order quantities.
Q3. Can I have a sample order for LED Tri-proof Light ?
A3: Yes, sample order to test and check quality is welcomed. Mixed samples are acceptable.
Q4: How do you ship the finished production ?
A4:By SEA, AIR or Express(DHL,UPS,Fedex,TNT,etc) are optional.